E70 Batumi Bypass – Highway Superstructure and Reinforced Concrete Tunnel Works
All projects
Batumi | 2019-2024 | MAPA & Polatyol Joint Venture

E70 Batumi Bypass – Highway Superstructure and Reinforced Concrete Tunnel Works

Highway superstructure and reinforced concrete tunnel works for the Batumi Bypass between Khelvachauri and Makhinjauri, comprising 21 bridges and 5 tunnels.

Overview

On the Batumi Bypass between Khelvachauri and Makhinjauri — comprising 21 bridges and 5 tunnels — works covering bridge piers, pier caps and deck slabs, reinforced concrete tunnel works and escape tunnels, box culverts, retaining walls, pile reinforcement, mechanically stabilized earth walls, U-channels and tunnel technical buildings were completed in 2024.

Category
Engineering & Infrastructure Projects
Status
Completed
Location
Batumi, Georgia
Year
2019 — 2024

Gallery

E70 Batumi Bypass – Highway Superstructure and Reinforced Concrete Tunnel Works — 1
E70 Batumi Bypass – Highway Superstructure and Reinforced Concrete Tunnel Works — 2